qustions 1:
the output of scope change control consists of--
a. cope changes, corrective action, and lessons learned
b. corrective action, scope changes, and project plan updates
c. performance measurement, additional planning, and lessons learned
d. work results, product documentation, and formal acceptance
qustions 3:
the scope statement--
a. dose not include project objectives such as cost, schedule, or quality measures
b. includes a description of project assumptions and constraints
c. provides a documented basis for preparing the pert/cpmwork
d. describes how the wbs will be structured
qustions 5:
to relate&nbs p;the functional organizations to the wbs elements, the project manager should use a--
a. wbs index
b. project wbs
c. cost account matrix
d. work package assignment idex
qustions 2:
all the following are project selection methods except--
a. logical framework analysis
b. analytic hierarchy process
c. expert judgment
d. decision trees
qustions 4:
the project charter should be issued by--
a. the project manager
b. the head of the performing organization
c. a manager external to the project
d. the project sponsor
qustions 6:
a. requiremen ts
b. project plan
c. scope management plan
d. wbs
上一篇:PMP美国项目管理模拟题精选8
+《PMP美国项目管理模拟题精选9》相关文章
- PMP美国项目管理模拟题精选9
- › PMP美国项目管理认证考试的模拟题精选10
- › PMP美国项目管理模拟题精选9
- › PMP美国项目管理模拟题精选8
- › PMP美国项目管理认证模拟题精选7
- › PMP美国项目管理认证考试模拟题精选6
- › PMP美国项目管理认证样题4(1)
- 在百度中搜索相关文章:PMP美国项目管理模拟题精选9
- 在谷歌中搜索相关文章:PMP美国项目管理模拟题精选9
- 在soso中搜索相关文章:PMP美国项目管理模拟题精选9
- 在搜狗中搜索相关文章:PMP美国项目管理模拟题精选9